|
|
Vans RV6 Quickbuild kit, owned and under construction
by Nigel Hitchman and Ed Hicks.
Prior to the arrival of the kit itself, Ed and Pete Hicks spent a long time with Nigel planning and converting their garage into a fine workshop, well equipped and lighted, worthy indeed of a product from the Vans Aircraft factory. The kit arrived on 15th August this year (2000) and with help from a willing group of Bristol Strutters it was safely installed in it's new home.
Many hours were spent initially sifting through the boxes of parts and fittings, and poring over the build drawings to ensure a logical assembly sequence was developed. Work on the project since has been steady and consistent, but more importantly enjoyable!
The builders are impressed by the high standard of workmanship evident in the
kit as it arrived from Vans'. All the parts are jigged in the factory
where necessary, so fitting together is a satisfying process.
Since these pictures were taken, the tailplane and fin have been rigged, and all fuselage skins have been drilled and cleko'ed in place prior to inspection and stage sign-off by their inspector. Watch this page for periodic progress reports. It seems apparent already that the Quickbuild kit really is quick, so this aeroplane could be rolled out sooner than we thought!
|